Thread: Strike
View Single Post
  #1  
Old 04-01-2015, 10:37 AM
60sstuff's Avatar
60sstuff 60sstuff is offline
Ultimate Warrior
 
Join Date: Sep 2002
Location: Left Coast
Posts: 2,792
Default Strike

I'm not to familiar with the strike that happened in late 64 (early 65 built)?

I'm I wrong that it was 30-40 days long in or around late Sept into Oct ?

So a car being built at this time frame would have been setting for about a month ???

__________________
1) 65 GTO Survivor. 43,440 Original Miles. “Factory” Mayfair Maize Paint with Black Pinstripe, Black Cordova Top, Black Interior, OEM Numbers Matching Powertrain. Purchased from the Lady that bought it new. Baltimore Built (11A).
2) 66 GTO Survivor. “Factory” Cameo Ivory Paint with Red Pinstripe, Red Interior. OEM Numbers Matching Powertrain. Tri-Power (OEM Vacuum Linkage), Automatic "YR" code (1759 Produced). Fremont Built (01B), with the Rare 614 Option.