Hoping for next month. I'm chipping away at it.
Switched from my old 7AL3 to a Grid on the assumption that I'll need a curve on the starting line. Also added a data logger which took much longer than it should have.
Work schedule has been crazy as well. Gotta make hay while the sun is shining.
|