Quote:
Originally Posted by goatless View Post
I'm guessing code in WI is similar to here in CT, where the post/footing is supposed to be 42" below grade. Depending on who built that deck, pulling the posts could be relatively easy or an absolute nightmare. Worst case scenario, the posts are set in a giant lump of concrete buried 40+ inches down.
LOL, usually the worst case scenario is always my first option. Not sure this would fly or not, but im gonna try pulling them up with a jack...……..BUT could I possibility dig down say a foot or so and just cut them off...…….im thinking im gonna need quite a bit of sand to raise the ground up, so even with 5-6 inches of concrete the posts should be quite a bit under.

Im gonna mess with this tomorrow, supposed to be in the upper 80"s I will wait until then just to make it all the more enjoyable. lol

Thanks

Rich