FAQ |
Members List |
Social Groups |
Calendar |
Search |
Today's Posts |
|
THE LOBBY A gathering place. Introductions, sports, showin' off your ride, birthday-anniversary-milestone, achievements, family oriented humor. |
Reply |
|
Thread Tools | Display Modes |
#1
|
||||
|
||||
Living in NorCal, looking for temp work
Hi Everyone, im living in San Jose and I am waiting for a job to come my way, in the meantime im looking for temp work.
I am a Journeyman Electrician by trade, but can help with just about anything. Let me know if you need any help, Ozzy Just wanted to add if you someone owns a shop like a welding,cnc, machine Im willing to volunteer my time if you can teach me some new skills.
__________________
463 Stroker Kit. ross pistons. h beam rods. eagle crank. 62 heads 72cc, port matched Performer RPM-850DP Auburn- 3.55 gear CC HR custom grind Last edited by *67firebird*; 02-22-2017 at 09:39 PM. |
#2
|
||||
|
||||
Ozzy, wish you were in the Chicago area. I would have a bunch of small electrical jobs for you to help fill in the time. Good luck to you.
-Kevin
__________________
1972 Firebird 462, 6X heads, RA4 cam, iron intake, Cliff's Q-Jet 3925 race weight Best of 12.88 @ 105 so far |
#3
|
||||
|
||||
Thanks Kevin. I wish I was in Chicago too, I ate some of the best pizza and hot dogs ever when I took a vacation out there in 11'.
__________________
463 Stroker Kit. ross pistons. h beam rods. eagle crank. 62 heads 72cc, port matched Performer RPM-850DP Auburn- 3.55 gear CC HR custom grind Last edited by *67firebird*; 02-23-2017 at 11:10 AM. |
#4
|
||||
|
||||
I just wanted to show my landscaping project. Took me 2 weeks by myself and waiting for a couple days of rain to go by.
I had to remove 10 yards of dirt/grass with a wheel barrel and shovel. Then lay down 9 yards of road base, compact it.8 yards of decomposed granite(deegee) and compact it 3 times. My friend did help me with removing the dirt/grass , but otherwise did it by myself. I bought some flat 1/8"x6"x10' steel and bent them at 90 degrees and welded them together to make my small faux retaining wall. I will never do this kind of project for someone on my own, I would rent some equipment or get some day laborers! My back was sore for days, that's another reason why it took 2 weeks. I had to do a couple half days cause of my soreness.
__________________
463 Stroker Kit. ross pistons. h beam rods. eagle crank. 62 heads 72cc, port matched Performer RPM-850DP Auburn- 3.55 gear CC HR custom grind Last edited by *67firebird*; 02-23-2017 at 10:44 AM. |
#5
|
|||
|
|||
That is quite the change!
|
#6
|
||||
|
||||
I made this bench a couple years ago.
Gave my kitchen a facelift, removed the ugly pink and white tile and pink sink. stripped my cabinets and painted them. installed brushed nickel knobs and hinges. installed white subway tile and an Ikea butcher block counter top. The more i look back at the work i've done, the more i feel handy. Show me the projects you need help with.
__________________
463 Stroker Kit. ross pistons. h beam rods. eagle crank. 62 heads 72cc, port matched Performer RPM-850DP Auburn- 3.55 gear CC HR custom grind Last edited by *67firebird*; 02-23-2017 at 11:57 AM. |
#7
|
||||
|
||||
Anyone have switchgear they need terminated? HIGH VOLTAGE JUNKIE!
__________________
463 Stroker Kit. ross pistons. h beam rods. eagle crank. 62 heads 72cc, port matched Performer RPM-850DP Auburn- 3.55 gear CC HR custom grind |
#8
|
||||
|
||||
https://sfbay.craigslist.org/sby/trd/6018577780.html just saw this tonite
|
Reply |
|
|