FAQ |
Members List |
Social Groups |
Calendar |
Search |
Today's Posts |
#1
|
|||
|
|||
If my block is already at zero deck is there any reason to surface the deck? If there is a need to surface the deck and it is at zero, is the block junk?
Any San Diego recommendations for a competent, quality machine shop in San Diego county? Just like getting second opinions about dovtors I want to get second and third opinions about machine shops.
__________________
Inside of every small problem there is a big one struggling to get out..... |
#2
|
|||
|
|||
If my block is already at zero deck is there any reason to surface the deck? If there is a need to surface the deck and it is at zero, is the block junk?
Any San Diego recommendations for a competent, quality machine shop in San Diego county? Just like getting second opinions about dovtors I want to get second and third opinions about machine shops.
__________________
Inside of every small problem there is a big one struggling to get out..... |
#3
|
|||
|
|||
You should be able to cut .002 to .004 and not worry about it. So you have -.004 out the hole. It makes for better quench too.
|
#4
|
|||
|
|||
[This message has been edited by Todd (edited 07-18-2000).]
|
Reply |
|
|