View Single Post
  #1  
Old 12-03-2007, 12:52 PM
ho428's Avatar
ho428 ho428 is offline
Ultimate Warrior
 
Join Date: Jan 2007
Location: South Carolina
Posts: 2,687
Default Subframe question

Got the floor out, starting the prep for going back in with a new full pan. I'll be going with 1/2" lower solid body mounts.
Question: Do I weld the subframe connector to the front subframe? I'll cut the floor and weld it to the rear frame and to the floor, but wasn't sure about the front. Makes pulling the subframe a lot tougher in the future but if that's how it's done...

I will be running tubes out to the front through the firewall, but those are easier to cut loose should I have to.
Attached Thumbnails
Click image for larger version

Name:	100_1383.jpg
Views:	70
Size:	47.3 KB
ID:	113435   Click image for larger version

Name:	100_1384.jpg
Views:	76
Size:	55.2 KB
ID:	113436   Click image for larger version

Name:	100_1385.jpg
Views:	56
Size:	54.1 KB
ID:	113437