View Single Post
  #25  
Old 02-25-2012, 03:49 PM
Zoojelly's Avatar
Zoojelly Zoojelly is offline
Member
 
Join Date: Jan 2006
Location: Off a Florida Dirt Road
Posts: 60
Default

I am painting when weather is good and started seats when wet; The first seat bottom took 3 hours but I have a technique down, Stretch exactly where you want it, poke a hole where hog ring goes insert hog rings all along edge and clinch down a portion at a time.
I added lower control arm braces and replaced bushings, KYB shocks,new coil springs and insulators and lower sway bar.regretfully had to farm out pressing in control arm bushings for $20.
I am starting rebuild of pinion and wheel bearings and installing new brake lines and rear drum brake hardware.
step 6 floor panels
step 7 repair frame
step 8 rebuild rear suspension
step 9 paint body interior, firewall and trunk
step 10 brakes
After brakes is paint body exterior and sit body on frame!
Attached Thumbnails
Click image for larger version

Name:	2-24-12 gto crmc 030.jpg
Views:	115
Size:	219.0 KB
ID:	276285   Click image for larger version

Name:	2-24-12 gto crmc 031.jpg
Views:	73
Size:	42.9 KB
ID:	276287   Click image for larger version

Name:	2-24-12 gto crmc 032.jpg
Views:	90
Size:	47.0 KB
ID:	276289   Click image for larger version

Name:	gto rear suspension 001.jpg
Views:	111
Size:	87.2 KB
ID:	276298  

__________________
Almost done 68 GTO 4 speed Rust Bucket}Step 18 engine accessories area
http://forums.performanceyears.com/f...=1#post3561418

Last edited by Zoojelly; 02-25-2012 at 04:03 PM. Reason: add steps