Trans Tunnel pics
Missed posting these progress pics on the completed trans tunnel. My buddy Rob Livingston did all the work...we used 2" thick foam attached to the top/sides of trans to crate the right size hole and patch panels for mock up... making sure I had the proper breathing room.... he but welded ground both sides.. after seam sealer and paint it looked nearly factory!
And yes the trans went in and out easily...all trans bolts were reachable by hand... however having the BOP to Chebby trans adapter plate (for the 700R4) moves the top bolts lower to a more accessible location.
|