Hello & thanks for the interest. I have a revision B install guide in the works showing baby steps on the prep and install.
The kit has a total of 6 bolt forces acting on it plus a full epoxy bond on each aluminum block all around.
The kit requires 4 drill and tap locations 5/16-24. No drilling or tapping into the cam bores needed.
Drill & tap locations as follows:
1. Front of block, through hole. Utilizing the small billet steel banjo bolts and set screws acting on the aluminum block.
2. Front of lettering pad (cubic inch lettering pad 00/50/55).
3: Rear of lettering pad.
4: Rear of block, through hole. Same deal as the front
|