View Single Post
  #16  
Old 01-02-2020, 07:03 PM
RUDOLFSSON's Avatar
RUDOLFSSON RUDOLFSSON is offline
Ultimate Warrior
 
Join Date: Mar 2002
Location: Kopavogur, Iceland
Posts: 1,013
Default

Hello & thanks for the interest. I have a revision B install guide in the works showing baby steps on the prep and install.

The kit has a total of 6 bolt forces acting on it plus a full epoxy bond on each aluminum block all around.

The kit requires 4 drill and tap locations 5/16-24. No drilling or tapping into the cam bores needed.

Drill & tap locations as follows:

1. Front of block, through hole. Utilizing the small billet steel banjo bolts and set screws acting on the aluminum block.
2. Front of lettering pad (cubic inch lettering pad 00/50/55).
3: Rear of lettering pad.
4: Rear of block, through hole. Same deal as the front
Attached Thumbnails
Click image for larger version

Name:	IMG_2517.jpg
Views:	1636
Size:	70.2 KB
ID:	528049   Click image for larger version

Name:	Capture.jpg
Views:	1915
Size:	54.2 KB
ID:	528050  

The Following User Says Thank You to RUDOLFSSON For This Useful Post: