This is an example of both concrete and plastic ground wells( I called them sleeves). Concrete photo does not show lid. Both are placed to where concrete is to be finished before pouring concrete deck.
You can definitely getting a new rod installed away from the deck but if you use the same ground wire and extend it to a different rod location, the wire must be " irreversible spliced or exothermic welded".
Quote:
Originally Posted by gtorich
Thanks West coast...………..not sure how pre-cast sleeves and covers are gonna look like in the concrete patio deck...……...im thinking of just getting a new rod or two installed elsewhere on the side of the house...……..any thoughts on this.
Rich
|