Quote:
Originally Posted by slowbird
You need to work on posting accurate info.
Cost is exactly the same (lots of $$$)! Both heads begin at same point. BES has cnc program for both heads. Both take same time to port/prepare. Only cost difference would be initial bare casting cost and i bet that's probably a wash.
|
10,500$ is cheap for what you get from BES. Winner,winner chicken dinner.