
02-24-2026, 05:01 PM
|
 |
Ultimate Warrior
|
|
Join Date: Jan 2012
Posts: 11,924
|
|
Quote:
Originally Posted by grivera
I posted about this contradiction in the instructions re: the plunger being in the center of travel. On a 7/16 stud, one full turn is .050 so it'll take 1.25 turns/.0625 to be at the center of travel. 3/4 turn is only .0375 pre-load, or 1/3 of full travel.
|
Yup
__________________
2019 Pontiac Heaven class winner
https://youtu.be/XqEydRRRwqE
|