View Single Post
  #7  
Old 04-26-2026, 07:29 PM
jhein's Avatar
jhein jhein is offline
Ultimate Warrior
 
Join Date: Dec 2020
Posts: 1,511
Default

Made some good progress today. I got the tank straps bent/shaped about as good as I think I can, so that's done. I got the hole cut for the access door. Mounted the relay and circuit breaker. I'm gonna pause here because my suspension parts are on the way from PTFB and I want to do the rear before I "permanently" mount the tank. But really, everything is pretty much done except for the fuel lines. I still need to do some proper cable management, but I'll get that all tidied up.






__________________
70 TA, 467 cid IAII, Edelbrock D-port heads, 9.94:1, Butler HR 236/242 @ .050, 520/540 lift, 112 LSA, Q-jet, TKX (2.87 1st/.81 OD), 3.31 rear

https://youtube.com/shorts/gG15nb4FWeo?feature=share
The Following User Says Thank You to jhein For This Useful Post: