Work is progressing once again! We have had 3-4 days of much colder than normal weather. This is allowing me to have some time to really get some work done underneath the car. It took 4 of us to push the SD into my actual shop so I can get it up in the air on the lift. I had been working on it in my other garage on the floor with jack stands for several months when time allowed. Now up in the air, things are so much easier to get done. The short list: Speedometer cable, transmission dipstick, cooler lines, shift backdrive linkage, starter, lower parts of the engine harness, gas tank, rear fuel and vapor lines, torque converter bolts and cover, parking brake cables, driveshaft, the list goes on and on.

I will post some pics in the coming days. I have 2-3 more days to get as much done as possible. Then I will have to push it out one more time. Hopefully , after the next time I push it back inside, it will leave under it's own power for the first time in 46 years!

The Following 4 Users Say Thank You to mgarblik For This Useful Post: