Since it finally stopped raining after a week or so I decided to reinstall the drivetrain back on the finished subframe. Using my superior male logic I figured I would lift the engine and move the subframe around under it and then set it down. This was my "Plan B" after I couldn't move the engine and trans assembly by myself while it was up in the air on the winch.
Last edited by njsteve; 10-15-2005 at 07:03 PM.
|