My permit was approved yesterday and a rep from Shirk Pole Buildings is coming out on the 28th for contract finalization. Once this building is up, it will be a long time before I can add metal walls/ceiling and thick insulation- as in more than a year. My first upgrade will be the electrical as its an absolute necessity.
I gotta wait on the thick insulation, in the meantime should I opt for the Shirk installed 1/2" or 1" foil faced insulation under roof and siding to aid in heat/cold retention and avoid condensation? Prices are 1/2" for $2450 and 1" for $3650. Eventually I will install thicker insulation. Is the thin insulation a complete waste of money or worthwhile investment? Other suggestions to avoid condensation when I use a bullet propane heater or kerosene heater?
__________________
Will Rivera '69 Firebird, 400/461, 290 Eddy D-Ports, HR 230/236, 4l80E, 8.5 Rear, 3.55 gears '69 LeMans Vert, XS 350, #47 heads, TH400, 10 Bolt 3.23 gears, work in progress ‘66 Lemans, 455, 310 KRE D-Ports, HR 236/245, TH400, GV OD, 12 bolt 3.73 gears - see it here: https://youtu.be/RP_s1wJKm_Y?si=K0NZxoTyaGcj8Dcb |
| Reply |
| Thread Tools | |
| Display Modes | |
|
|