#1  
Old 04-20-2022, 12:17 PM
RUDOLFSSON's Avatar
RUDOLFSSON RUDOLFSSON is offline
Ultimate Warrior
 
Join Date: Mar 2002
Location: Kopavogur, Iceland
Posts: 1,013
Default

Great thread... I too have this on my to do list. I had a cnc 5 axis in mind or a manual horizontal deal...

Nice fixturing there sherminator2 ! What max angle can you get out of it ? This is what machining is all about.. the creative routes!

Does anyone know the common angle of the splayed holes ?


Thanks
Kris.

  #2  
Old 04-21-2022, 08:13 PM
shermanator2 shermanator2 is offline
Senior Member
 
Join Date: Nov 2010
Location: San Diego, CA and Niwot, CO
Posts: 120
Default

Quote:
Originally Posted by RUDOLFSSON View Post
Nice fixturing there sherminator2 ! What max angle can you get out of it ? This is what machining is all about.. the creative routes!
I did not intend to get a large angle. Just enough to square the engine block to the table. I was thinking of nodding the head of the mill to do the splayed bolts.

This does bring up an interesting thing though. The block is inherently unstable on this fixture until it is bolted to the table. Visualize the center of rotation below the table and the center of mass way above it. The block will literally try to roll right off of the table.

BE VERY VERY CAREFUL! Keep the block hanging on an engine hoist until it is well secured to the table.

Quote:
Originally Posted by RUDOLFSSON View Post
Does anyone know the common angle of the splayed holes ?
I just measured the Milodon caps that I have and the bolts are canted 18°.

The Following User Says Thank You to shermanator2 For This Useful Post:
  #3  
Old 05-20-2022, 08:27 PM
73 TRANSAM 73 TRANSAM is offline
Chief Ponti-yacker
 
Join Date: Jun 2008
Posts: 551
Default

What I did on mine is to weld 6AN fitting then use a braided line then cut it to length for the dipstick to read correctly. This way its flexible enough then when ur done, just cap it with a 6AN plug. Incase ur running a vacuum pump.

  #4  
Old 05-19-2022, 09:29 AM
spectramitch's Avatar
spectramitch spectramitch is offline
Senior Member
 
Join Date: Apr 2019
Location: MI
Posts: 135
Default

I have the new dowels installed and they fit very nice now. I have layed out the thrust 'step' dimensions. I will do a rough cut and re-install and make sure measurements are lining up before finish cut.

For drilling the 18° holes, how deep until the water jacket becomes close?
Attached Thumbnails
Click image for larger version

Name:	IMG_5503.jpg
Views:	242
Size:	59.3 KB
ID:	591134   Click image for larger version

Name:	IMG_5536.jpg
Views:	252
Size:	60.9 KB
ID:	591135   Click image for larger version

Name:	IMG_5541.jpg
Views:	248
Size:	63.0 KB
ID:	591136  

Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 09:31 AM.

 

About Us

The PY Online Forums is the largest online gathering of Pontiac enthusiasts anywhere in the world. Founded in 1991, it was also the first online forum for people to gather and talk about their Pontiacs. Since then, it has become the mecca of Pontiac technical data and knowledge that no other place can surpass.

 




Copyright © 2017