Reply
 
Thread Tools Display Modes
  #1  
Old 12-27-2008, 11:25 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

With it being Christmas I didn't get anything much done. I re-repaired the heater box after installing one of the door shafts upside down. Removing it broke the box so I fiberglassed it and will try again tomorrow.
I got the dash and forward lamp harness for Christmas (Ain't my wife the best?). It should arrive about the 2nd of January.
I will update time and cost tomorrow night.

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #2  
Old 12-29-2008, 12:47 AM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

Three hours labor today on the heater box and I bought a new rag joint for $35.30.


My labor 267 Hrs.......$5,340.00
Parts......................$7,615.23
Outside Labor...........$3,300.00

Total.....................$16,255.23

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #3  
Old 12-30-2008, 11:26 PM
Old Blue 66 Old Blue 66 is offline
Ultimate Warrior
 
Join Date: Aug 2005
Posts: 6,351
Default

Youve managed to save a ton of money so far. Most body shops would just be finishing the bodywork an paint for $16K.

  #4  
Old 12-31-2008, 12:44 AM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

I hope I haven't misled anyone here. While the bodywork has been done,except for the hood, the car has not been painted. It has only been jammed out. My body man said it would take about $5,000.00 more to finish.

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #5  
Old 01-04-2009, 09:24 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

I didn't get much done this week. Installed the engine wiring harness and two belts. I took the front fenders and core support back off to make it easier. I took the A/C evaporator box apart and washed about 5 pounds of leaves and trash out of it. Is there a way to bench test the evaporator?
Anyway, I spent four more hours and $22.37 on parts so her are the latest.

My Labor at 271 hours.......$5,510.00
Parts..............................$7,637.60
Outside Labor..................$3,300.00

Total............................$16,357.60

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #6  
Old 01-11-2009, 10:53 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

I pressure tested the evaporator this week. And that is all I got done. I had to work until Thursday afternoon and then was out of town until Saturday night.
Only had 1 hour labor so I will add it to next weeks totals. My job appears to be running out in the next few weeks so, unless something comes up I will have a lot of time(read that no money) to work on the car.

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #7  
Old 01-11-2009, 11:10 PM
Blue '66's Avatar
Blue '66 Blue '66 is offline
Ultimate Warrior
 
Join Date: Jan 2002
Location: MO
Posts: 2,336
Default

Sorry to hear about your job Phil.What are you going to do after your current job finishes up?

  #8  
Old 01-12-2009, 06:49 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

I am going to relax and let my wife keep me living the lifestyle I have become accustomed to!

I will find something. The good Lord has provided for me all my life and I trust he will in the future.

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #9  
Old 01-12-2009, 07:47 PM
Blue '66's Avatar
Blue '66 Blue '66 is offline
Ultimate Warrior
 
Join Date: Jan 2002
Location: MO
Posts: 2,336
Default

Quote:
Originally Posted by fyrffytr1 View Post
I am going to relax and let my wife keep me living the lifestyle I have become accustome to
I LIKE that plan!!Let me know how it works out

My wife will finish her last semester here this spring and graduate in Aug so we will be moving when she finds a job.I just might try your plan Phil if it work good for you!

  #10  
Old 01-18-2009, 11:18 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

Well, work was really hectic this week. We had two jobs that had to be done by lunchtime Friday. Then, I helped a friend work at his church Friday afternoon and all day Saturday. They are building a new church and I helped with some of the trim work.
Anyway, you all know that means there was no time to work on the car. I keep saying that I will have some downtime in the near future but, somehow there is work to do. I am thankful for the work and as long as there is some the car will have to wait.
Now, I have to make a correction to my totals. I figured my hours wrong and have to take $90.00 off that total.(Y'all are supposed to catch these errors). And, I need to add a new category. That is gifts. I received $716.52 worth for Christmas. You can feel free to add to this total at anytime.
I spent $45.97 on various cleaning supplies and Rotella-T oil. So, here are the new totals
Labor at 271 hrs.............$5,420.00
Parts............................$7,683.57
Outside Labor................$3,300.00
Gifts...............................$716.52

Total..........................$17,120.09

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #11  
Old 01-25-2009, 08:57 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

Well, in between rain showers I was able to get a little done yesterday and today. I wire wheeled the metal vaccuum line that runs from the carb to the trans, the metal parts on the throttle cable, gas pedal and the brake booster.
I installed the gas pedal and linkage. I also painted and temporarily installed the brake booster and brake pedal assembly.
I even got all 8 spark plugs gapped and put in. I should be able to get this thing cranked in a couple of weeks. Oh yeah, I almost forgot, I put the thermostat and housing in too. Am I on a roll or what?
Here are some pics of the booster and my heater box.
I spent 5 hours doing this and bought $39.61 worth of parts and cleaners.
Anyway, here are the new totals:

Labor at 276 hrs.............$5,520.00
Parts............................$7,723.18
Outside Labor................$3,300.00
Gifts...............................$716.52

Total..........................$17,259.70
Attached Thumbnails
Click image for larger version

Name:	boostar 1.JPG
Views:	144
Size:	198.2 KB
ID:	155786   Click image for larger version

Name:	booster2.jpg
Views:	128
Size:	31.2 KB
ID:	155787   Click image for larger version

Name:	Heater box.JPG
Views:	169
Size:	191.8 KB
ID:	155791   Click image for larger version

Name:	booster4.JPG
Views:	156
Size:	103.9 KB
ID:	155790   Click image for larger version

Name:	booster3.JPG
Views:	146
Size:	185.5 KB
ID:	155789  


__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #12  
Old 02-02-2009, 12:12 AM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

I spent several hours trying to get the parking brake system installed. Finally figured out I had the wrong crossmember hook. I got the core support reinstalled along with the radiator and started to put the gas tank in. That is not an easy job for an old man.
I had to re-re-do the back brake shoes as I had the wrong ones. I was sold 245s when I needed 242s The little difference in size made a big difference with fit and function. I got a $7.38 refund for the price difference in the brake shoes. I also buffed out the pedal pad trim. It turned out really nice.
I took some pics but have not downloaded them yet. I will post them when I do. I put 11 1/2 hours labor in so here are the new totals.
Labor at 287 1/2 hrs...........$5,750.00
Parts...............................$7,715.80
Outside Labor....................$3,300.00
Gifts...................................$716.52
Total.............................$17,482.32

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #13  
Old 02-03-2009, 11:42 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

Her are a few pics of what little progress I have made. I stillhave some work to do on the core support such as cleaning it and installing the seals. I am also going to replace the valve covers and air cleaner. What do you use to clean the rubber pedal pads?
Attached Thumbnails
Click image for larger version

Name:	Front end.JPG
Views:	177
Size:	234.8 KB
ID:	156771   Click image for larger version

Name:	Front end 2.JPG
Views:	151
Size:	188.1 KB
ID:	156772   Click image for larger version

Name:	master cylinder.JPG
Views:	182
Size:	217.7 KB
ID:	156773   Click image for larger version

Name:	Gas Pedal.JPG
Views:	125
Size:	112.3 KB
ID:	156774   Click image for larger version

Name:	pedal trim.JPG
Views:	125
Size:	203.8 KB
ID:	156775  


__________________
Remember no one is perfect. Everyone's butt has a crack in it!

Last edited by fyrffytr1; 02-03-2009 at 11:51 PM.
  #14  
Old 02-03-2009, 11:44 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

Some more
Attached Thumbnails
Click image for larger version

Name:	Parking Brake.JPG
Views:	128
Size:	174.7 KB
ID:	156777   Click image for larger version

Name:	Parking Brake 1.JPG
Views:	133
Size:	169.0 KB
ID:	156778   Click image for larger version

Name:	Parking Brake 2.JPG
Views:	144
Size:	197.2 KB
ID:	156779   Click image for larger version

Name:	Parking Brake 3.JPG
Views:	134
Size:	92.5 KB
ID:	156781   Click image for larger version

Name:	Parking Brake 4.JPG
Views:	163
Size:	190.6 KB
ID:	156782  


__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #15  
Old 02-04-2009, 12:12 AM
Greg Reid's Avatar
Greg Reid Greg Reid is offline
Ultimate Warrior
 
Join Date: May 2003
Location: Palmetto, GA. USA
Posts: 16,177
Default

That's looking sharp Phil!

__________________
Greg Reid
Palmetto, Georgia

  #16  
Old 02-03-2009, 11:48 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

I know this is nit picking but I even cleaned and cleared the dimmer switch for re-use.
It has a little pitting but is functional
Attached Thumbnails
Click image for larger version

Name:	dimmer 1.JPG
Views:	98
Size:	129.2 KB
ID:	156783   Click image for larger version

Name:	dimmer 2.JPG
Views:	89
Size:	186.7 KB
ID:	156784   Click image for larger version

Name:	dimmer 3.JPG
Views:	116
Size:	111.0 KB
ID:	156785   Click image for larger version

Name:	Dimmer 4.JPG
Views:	103
Size:	100.7 KB
ID:	156786  

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #17  
Old 02-08-2009, 10:33 PM
Blue '66's Avatar
Blue '66 Blue '66 is offline
Ultimate Warrior
 
Join Date: Jan 2002
Location: MO
Posts: 2,336
Default

Quote:
Originally Posted by fyrffytr1 View Post
I know this is nit picking but I even cleaned and cleared the dimmer switch for re-use.
It has a little pitting but is functional
I went out and bought a new one,my old one had a little sand still in it.I got it from the parts store.

  #18  
Old 02-04-2009, 01:18 AM
saltman 1965's Avatar
saltman 1965 saltman 1965 is offline
Senior Chief
 
Join Date: Jun 2007
Location: Baton Rouge LA
Posts: 261
Default

Not nit picking but attention to the details. Maybe obsession that's what my EX called it. On the pedal pads Bleche-Wite tire cleaner & a stiff brush should clean out that red GA clay & some Mothers polish & #000 steel wool on the trim. Can not wait to see when its done. Saltman

__________________
1965 Lemans Vert
1968 Shelby GT 500 KR
  #19  
Old 02-08-2009, 09:43 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

I went to the Moultrie swap meet yesterday and came home empty handed. For a show as big as this is there are never any Pontiac parts or vendors.
But, even though participation was down there were still about 1,500-2,000 cars in the corral and I looked at most all of them.
My buddy and I got there at 8am and walked until 4pm with only a 15 minute sit-down to eat a bite.
He bought 4 tires from Coker for his 57 Chevy resto and I pulled them,on a wagon, about 3/4s of a mile to his truck.That may not sound like much but when you are dodging thousands of spectators it can be a chore.
I didn't get anything done on mine. I did push it out of the shop. Then, I went through all my parts and sorted them out. I also cleaned up the shop so I have some room now.
All the totals remain as last week.

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
  #20  
Old 02-12-2009, 11:48 PM
fyrffytr1's Avatar
fyrffytr1 fyrffytr1 is offline
Ultimate Warrior
 
Join Date: Oct 2003
Location: Leesburg, Georgia
Posts: 6,221
Default

Just a quick note. I ordered a few small parts from our host and they arrived today. So, after supper, I ran(Well, I walked kinda fast) out to the shop and put them on. Seven minutes later I was finished. I installed the heater hose nipple, stuck the molded heater hose on temporarily and put the throttle return spring on. I hope to get some work done tomorrow afternoon and maybe Saturday, but since it is Valentine's day I hope to get mushy with Momma

__________________
Remember no one is perfect. Everyone's butt has a crack in it!
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 08:35 AM.

 

About Us

The PY Online Forums is the largest online gathering of Pontiac enthusiasts anywhere in the world. Founded in 1991, it was also the first online forum for people to gather and talk about their Pontiacs. Since then, it has become the mecca of Pontiac technical data and knowledge that no other place can surpass.

 




Copyright © 2017