#121
|
||||
|
||||
|
Just posted a video for Day One of the site prep for the new shop. Job is done now, I'll get the other videos up in a day or so .... just your basic time lapse of the dirt work. Hope to have the shop start going up within two weeks.
https://www.youtube.com/watch?v=SNs_VmjRoBE
__________________
I'm World's Best Hyperbolist !! |
|
#122
|
||||
|
||||
|
I love that!! What a great idea to set that up for a video. Put a smile on my face. You never cease to amaze me!
Are you still going with the Blue Steel Manufacturing 40x60x12?
__________________
'69 GTO Convertible - Acquired October 2020. An all original project car. Restomod is underway PROJECT THREAD '83 Chevy Choo Choo SS El Camino - LT1 350/4L60e, Owned for 30 Years, completed 2nd restomod in 2018 PHOTO 2019 BMW 440ix - Twin turbo I6, 8spd auto. PHOTO '55 Chevy Bel Air Sport Coupe - Ram Jet 350 / T56 Magnum 6spd, Restomod Completed Sept. 2012, Sold Sept. 2021 PHOTO |
| The Following User Says Thank You to roger1 For This Useful Post: | ||
|
#123
|
|||
|
|||
|
Quote:
__________________
“It takes considerable knowledge just to realize the extent of your own ignorance.” Dr. Thomas Sowell |
| The Following User Says Thank You to hurryinhoosier62 For This Useful Post: | ||
|
#124
|
|||
|
|||
|
Quote:
__________________
“It takes considerable knowledge just to realize the extent of your own ignorance.” Dr. Thomas Sowell |
| The Following User Says Thank You to hurryinhoosier62 For This Useful Post: | ||
|
#125
|
||||
|
||||
|
Thanks Roger, yes it's a done deal with Blue Steel, very local outfit. They seemed willing to do everything we wanted. Building will be forest green, with brown doors, white roof, black trim. 3" insulation, flat ceiling, metal installed on all the interior walls and ceiling, 1 foot overhang on sides and gable ends. Interior will be white ceiling and battleship gray walls. 6" slab with 8" sections for future lift, 16 foot apron across the whole back (leading into the rear 10 x 10 door.
Crew did some extra dirt work for us while they were here, smoothed out the front lawns, filled in some gullies in a field, put in a driveway. HinH ... keep us posted, always interested in the process. Day One Part Two is up now ... https://www.youtube.com/watch?v=kM0yABnNK64 Short overhead drone shot here https://www.youtube.com/watch?v=lxvCUUS70C4 You'll have to forgive the quality of the drone work ... I basically live in fear of the drone ... it has physically attacked me several times, and it threatens to leave and never come back ... actually it's kind of like a crazy wife.
__________________
I'm World's Best Hyperbolist !! Last edited by dataway; 08-15-2024 at 08:30 PM. |
|
#126
|
|||
|
|||
|
Got a hunting buddy that is the lead maintenance guy there if you wanna tour…
You’re getting that spread tuned up for sure. Very nice! |
| The Following 2 Users Say Thank You to Sun Tuned For This Useful Post: | ||
|
#127
|
||||
|
||||
|
Sun Tuned ... thanks, I got our salesman to give me a tour first day I talked to him
So yes, I was interested in seeing the shop.Hoping we can get all the grass back in and growing well before winter. We probably need 1000 lbs of Fescue to do all the seeding we'd like to. Might end up getting a tiller for the skidsteer or tractor ... lots of hard ground that needs weeds turned under and smoothing. Couple of videos of day two .... I know this is boring but it's just the raw video we plan do use in a proper video at some point in the future to document the building process. Day Two Part One https://www.youtube.com/watch?v=hMCsC3SK_mI Day Two Part Two https://www.youtube.com/watch?v=zPtzBtQRLNU
__________________
I'm World's Best Hyperbolist !! |
|
#128
|
||||
|
||||
|
Latest video is a time lapse of the shop building materials being unloaded.
Basically 3 minutes of your life you'll never get back. Somehow they snuck in the delivery of the 46 trusses, 42 feet long ... wanted to get video of them sliding off the truck. Well, at least they got here on time. https://www.youtube.com/watch?v=9QtGdpKs0nM
__________________
I'm World's Best Hyperbolist !! |
| The Following User Says Thank You to dataway For This Useful Post: | ||
|
#129
|
||||
|
||||
|
5 minute time lapse of the first day of the shop building construction is posted at:
https://www.youtube.com/watch?v=W6zC-4Y27N0 So far, sorta so good. Had some difference in opinion with the company on what I was told I was going to get, and what I actually got. Worked things out to my satisfaction so far, but kinda put a damper on my euphoria.
__________________
I'm World's Best Hyperbolist !! |
|
#130
|
||||
|
||||
|
That must be exciting! Time lapse and a crew of construction guys makes it look way too easy. Glad the weather cooperated!
Last edited by Shiny; 09-18-2024 at 10:51 AM. |
| The Following User Says Thank You to Shiny For This Useful Post: | ||
|
#131
|
||||
|
||||
|
cool video
__________________
Esquire '74 T/A 455 Y-code SD clone previously on Dawson's Creek: '74 T/A 400 '81 AMC SX/4 '69 FB 350 |
| The Following User Says Thank You to kingbuzzo For This Useful Post: | ||
|
#132
|
||||
|
||||
|
Day Two ... Trusses going up ... ran out of battery towards the end. They worked till 7pm.
https://www.youtube.com/watch?v=yebqtzx6-Aw
__________________
I'm World's Best Hyperbolist !! |
|
#133
|
||||
|
||||
|
They built the trusses there?
Also, the concrete was already poured before they put the posts in? Cool videos.
__________________
John Wallace - johnta1 Pontiac Power RULES !!! www.wallaceracing.com Winner of Top Class at Pontiac Nationals, 2004 Cordova Winner of Quick 16 At Ames 2004 Pontiac Tripower Nats KRE's MR-1 - 1st 5 second Pontiac block ever! W.E.C moment "Every man has a right to his own opinion, but no man has a right to be wrong in his facts." "People demand freedom of speech to make up for the freedom of thought which they avoid." – Socrates |
| The Following User Says Thank You to johnta1 For This Useful Post: | ||
|
#134
|
||||
|
||||
|
Trusses were manufactured elsewhere ... hard to see in the time lapse but they carried them over one by one.
Post holes get filled with concrete when they pour the slab (hopefully today). Never seen it done that way before. They put enough dirt in the hole to fix the position of the post in the bottom of the hole, then fill up the top few feet of the hole with slab concrete. Not real happy about the bottom of the post being in the dirt, but having the post concrete tied to the slab seems a decent idea. Concrete is 4,000 psi fiber reinforced, overall thickness 6-7", deeper at the edges, door thresholds and lift pad.
__________________
I'm World's Best Hyperbolist !! |
| The Following 2 Users Say Thank You to dataway For This Useful Post: | ||
|
#135
|
||||
|
||||
|
Are there going to be any beams and rebar? Or wire mesh only?
__________________
'69 GTO Convertible - Acquired October 2020. An all original project car. Restomod is underway PROJECT THREAD '83 Chevy Choo Choo SS El Camino - LT1 350/4L60e, Owned for 30 Years, completed 2nd restomod in 2018 PHOTO 2019 BMW 440ix - Twin turbo I6, 8spd auto. PHOTO '55 Chevy Bel Air Sport Coupe - Ram Jet 350 / T56 Magnum 6spd, Restomod Completed Sept. 2012, Sold Sept. 2021 PHOTO |
| The Following User Says Thank You to roger1 For This Useful Post: | ||
|
#136
|
||||
|
||||
|
There will be rebar in the thresholds of the door openings, and in the lift pad. I don't think there will be any mesh at all. The original spec was 3000 psi concrete with mesh, the concrete "guy" is using 4000 psi fiber reinforced with no mesh. He says that fiber is better as it is homogenous throughout the concrete compared to mesh that sits a couple inches from the bottom .. specially on slabs 6" or more thick.
I suspect that he likes 4000/fiber as it saves the labor of having to put down the mesh, and having to walk around on it etc. Cost wise ... a wash, the 4000 is more expensive, but you save the price of the mesh. I'll be asking to see his receipt from the concrete company showing he actually is using 4000 psi with fiber reinforcement. I've never been a huge fan of mesh, most of the time it get's trampled down to the bottom unless they are very vigilant to continually pull it up while the concrete is being poured. And, after decade or so it's rusted inside the concrete to the point that it's not doing much of anything. I'd love to have a full 2' x 2' rebar grid in the whole thing ... but that would add considerably to the cost. Morbid to think about .. but .. this building has to serve me well for 20 years at most, odds are I'll be worm food by then, or sitting on my porch looking at Lake Como and drinking wine till I fall over every night ![]() I'm undecided about cutting crack reliefs in the surface. I know it's common practice in cold climates, but it doesn't seem to be a thing down here. This really isn't a "Morton Buildings" level of build. If I was 35 years old and had to live with it for 35 more years I'd probably be doing a few things differently.
__________________
I'm World's Best Hyperbolist !! |
| The Following User Says Thank You to dataway For This Useful Post: | ||
|
#137
|
|||
|
|||
|
I'm doing my floor soon 30x60 $$$$. I had planned on heat and mesh and Rebar in certain locations. I had the science of heated floor thought out over 10 yrs. Got books from numbing supply cos. Plans ,etc,insulation. ZURN was a big help,free. Anyway got talking to friends and heating friend. Couple of friends had heated floors. Gave me pros and cons. Decided not to do heat floor just use heaters in ceiling.There
was the economics considered. Remember I was self employed in construction with my father 25 + yrs. The floor is going minimum 4000 psi with fibre. Why?? Here is my thinking. Years ago we had a new basement floor cracking( found out hot load on 2nd round from supplier) so I called Portland cement association. Talked to a nice engineer there. He said 'if you can make the floor smooth on the bottom as the top there will be less chance of cracking' He said think of it as a piece of glass with a mark in it. Makes sense. So I'm using,4000psi, fiber mesh, no rods or steel mesh,no pex tubing and 5 inches thick. Now I'm considering whether to use #67 stone #57 stone. 57 stone here is maximum of 2 " in size with certain % . #67 are smaller approximately 1.5 " why thinking smaller stone more condensed mix the 57s are stronger being bigger stone. THE OLD K.I.S.S Simple. Last edited by sdbob; 09-21-2024 at 09:09 AM. Reason: Add words |
| The Following 2 Users Say Thank You to sdbob For This Useful Post: | ||
|
#138
|
||||
|
||||
|
After some research it does appear that 4000 with fiber is considered at the least a replacement for wire mesh, and in some cases superior to metal reinforced ... really depends on application.
Pretty sure they used #67 on our base, it all looks like a max of 1". I figure with the plastic vapor barrier on top of it, it will make a pretty smooth underside. The soil here is something to see, pretty high clay content .. it compacts as hard as rock, in fact I think in general in this locality they often pour right on top of compacted soil. You can drive a concrete truck on virgin soil here and it might make a depression about 1.5" deep. I've been driving around the property, both "lawn" and field with my 1/2 ton GMC with an IBC of water in the back over 2000 lbs and it doesn't even leave a mark ... I mean none.
__________________
I'm World's Best Hyperbolist !! |
|
#139
|
|||
|
|||
|
Hmm.
|
|
#140
|
|||
|
|||
|
I used the 4000 pound fiber reinforced concrete on the last slab I did about 5 years ago. The ground was compacted and 57 gravel added. Plenty of "control joints." No cracks anywhere. One of the secrets is to keep the concrete damp for an extended period of time. In my case that was for more than 2 weeks.
__________________
My money talks to me-it usually says goodbye! |
| The Following User Says Thank You to carcrazy For This Useful Post: | ||