View Single Post
  #3  
Old 07-10-2020, 09:29 PM
Verdoro 68's Avatar
Verdoro 68 Verdoro 68 is offline
Ultimate Warrior
 
Join Date: Jun 2003
Location: Clayton, CA
Posts: 2,824
Default

It happened on one of my good wheels which I'm now in progress of carefully wet sanding down. Rather than gamble on the others, I've been testing on an old RII. The can says to wait 30 minutes for the base to dry before clearing. I waited 8, 12 and 24 hours on my experiments. Maybe too long between the base and clear coat? I'll try a clear coat within 30 minutes and see what happens.

On the can it says to lay down your coats in three layers 10 minutes apart within an hour. After the initial hour, if you want to recoat it to do so in 7 days. So maybe you either lay the clear down within that 30 minute window or you wait a week?

__________________
Ken
'68 GTO - Ram Air II 464 - 236/242 roller - 9.5” TSP converter - 3.55 posi (build thread | walk around)
'95 Comp T/A #6 M6 - bone stock (pics)